October 23rd, 2014 News Release

Left to Right; Ian Smith, Consultant; Bruce Duncan, Former CEO of Canada Carbon; Richard Klue, SVP Tetra Tech WEI Inc. Met. Engineer; Dr. Luisa Moreno, Euro Pacific (Toronto) Metals & Mining Analyst

VN6 Close-up of Channel Sample

VN6 East

VN6 West

VN6 North

VN6 Channel Sample

Closer Look at VN6 Material

VN6 Facing West

VN4 Lump/Vein with Large Crystals

VN4 Lump/Vein Graphite - Large Crystals

VN4 Lump/Vein Crystalline Flakes

VN3 - Open Face

Hole DDH14-38 intersected the graphitic skarn in between 8 and 18.10 meters along core length, approximately 9m down from the VN6 surface mineralization (see boxes #2 and #3)

Hole DDH14-39 intersected the graphitic skarn in between 31 and 37.7 meters along core length, approximately 22m down from the VN6 surface mineralization

Hole DDH14-40 intersected the graphitic skarn in between 9.5 and 12.10 meters along core length, approximately 7m down from the VN6 surface mineralization

Hole DDH14-41 intersected the graphitic skarn in between 17 and 18.8 meters along core length, approximately 12m down from the VN6 surface mineralization
Additional Drill Core
3D Chargeability Showing Connection Between Showings